| Adrian lays tile in the new storeroom. |
| Installation of drain lines in the garden. |
Santa Barbara County Genealogical Society's Construction of New Wing on the Sahyun Library. Visit our Website at sbgen.org
| Adrian lays tile in the new storeroom. |
| Installation of drain lines in the garden. |
| Louise Matz and Jan Cloud take advantage of the new lights to sort books in the new wing until construction noise drove them back to the quieter old wing. |
| The numbers on the new shelves correspond to identical numbers on the old shelves, so that the books are kept in order when moved. |
| And here is our Librarian Kathy Morgan filling the new shelves with old books. |
| Marj Friestad was part of the crew to shelve books, too. |
| Emily Aasted and Marjorie Wilser review their plans for the move. |
| Adrian adds red tile window sills to give the windows a classy look. |
| The landscapers are digging ditches for drains, electrical conduits, and irrigation lines. |
| This project sure generates a lot of trash! |
| Meanwhile Betsee Talavera and John Fritsche install bookshelf supports on panels that will go into the last four bookcases. |
| Looks like sanding 90 bookcase moldings is fun! |
| Jim Friestad is plotting the positions of drill holes in some of the panels that we've spent weeks cutting, sanding, priming, staining, and varnishing. |
| Steve Martin assembles one of 56 floor boxes that will support two bottom shelves each. |
| Paul Cochet, Lars Heuchert, and John Fritsche install shelf brackets on a sunny day among the roses. |
| Lunch pause in the new stack room. |
| John, Gary (seated), Jim, and John assemble two of the 56 bookcase bays, 16 of which contain a shear panel for stability in the event of earthquake. |
| And at the end of the day, look what we've built: 6 of the 16 earthquake bays! The piles of panels give an idea of what is left to do - and then some!! |
| A painter stretches to put the finishing touches in the entry way. |
| John Fritsche and Bob Lynn make some final cuts with the panel saw. |
| A sanding crew works on the last of the bookcase panels. |
| The garden has been cleared of weeds and smoothed out to plot the locations of walkways, drain lines, electrical conduits, and irrigation lines. |
| Each shelf in the old stacks has been numbered for the eventual MOVE to the new stacks. |
| And here we are - a successful test set-up of three bays of just one of the new bookcases! |
| Anyone know this bird that was on Louise Matz' car? |
| This painter is priming the walls in preparation for painting tomorrow. |
| The electricians have some more work to do with these overhead fixtures in the stack room. |
| Cheryl Jensen, Tony Suhrer, and Thierry Fray consult over landscaping plans. |
| Cheryl, Thierry, and his crew get into details pertaining to location of drain lines, downspouts, electrical conduits, and sidewalks. |
| And here is the bookcase crew sawing, sanding, staining, and varnishing - as usual. |
| Part of the exterior is getting a plaster surface instead of brick. |
| We'll have plenty of light when the electricians finish their work. See the nice texture on the walls and ceiling and their color. |
| Jean, Gary, and Emily sanding, sanding, sanding . . . . |
![]() |
| Jim caught Art in the act of sanding one of the panels that will support the computer bench. |