| The first task is to dig out roots that have bulged up and broken the old asphalt. |
| Broken areas and places that always accumulate puddles have to be cut out and patched with new asphalt. |
| To conform with the provisions of our building permit, we had to create an additional parking slot, and that needed a half a truck load of new asphalt. |
| All the asphalt patches have to be rolled. |
| And then a coat of hot tar slurry is applied to the old and patched asphalt. |
| The entire lot all the way to the street was slurry coated, and the next day the only blemish was some tracks by a wayward raccoon. |
| Rudy and his helper came the next day to stripe the parking slots. |
| Rudy's last stripe was in front of the entry gate. When it dries, we can open the gate and we'll be open for business! |
No comments:
Post a Comment